Rodbourne Road Bridge Replacement

Detailed design for a replacement rail bridge

  • 50

    Hours Long Possession

  • Swindon, UK

    Swindon, UK

Helping Network Rail and their contractor replace a bridge nearing the end of its life

Three rail tracks are carried across Rodbourne Road rail bridge and run right next to the historic Swindon Railway Works. As the bridge neared the end of its life, Network Rail’s contractor commissioned our team to provide the detailed design of the essential new Up Reception bridge deck and the supporting cill beams that would keep one of the tracks operational. We were also responsible for the design of an abutment anchorage system and for the design of a new reinforced concrete robust kerb.

Although the design was based on the standard Network Rail design for a Z type deck, our team varied the design to include weathering steel. This meant the main girders on the replacement bridge, a fabricated steel half-through deck of deep steel main girders with a filler beam floor (steel cross girders and reinforced concrete infill), had increased resistance to corrosion, reducing the need for disruptive maintenance.

Stantec’s excellent understanding of railway works and the Network Rail system, together with close site support, meant the team were able to help the client complete all works on time, avoiding prolonged disruption to surrounding transport systems. 

At a Glance

Offices
Client
  • Dyer & Butler
Expert Spotlight

Stephen Wren, Technical Director

Every project brings different challenges to be embraced and resolved.

Stephen Wren

Technical Director

We’re better together

  • Become a client

    Partner with us today to change how tomorrow looks. You’re exactly what’s needed to help us make it happen in your community.

  • Design your career

    Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.

End of main content
To top