At a Glance
-
820
Foot Suspended Truss Span
-
1.6
Miles Long
- Location
- Vicksburg, Mississippi
- Offices
-
- Location
- Vicksburg, Mississippi
- Offices
Share
Vicksburg Old Highway 80 / Railway Bridge
Built in 1930, the Vicksburg Old Highway 80 Bridge is a one-of-a-kind structure listed in the National Register of Historic Places. For many years, it was the only bridge over the Mississippi River where highway and railroad tracks ran side by side through the truss structure. However, with only nine-foot wide highway lanes, safety became an issue, and the bridge ended vehicular access in 1988.
Today, the Kansas City Southern Railway Company (KCS) and Norfolk Southern (NS) continue to operate freight rail service on the train track side of the bridge, while pedestrians and event booths primarily use the opposite side. With its importance to ongoing rail operations, the bridge needed a safety inspection, and our bridge inspection team was brought in to provide capacity load rating, underwater investigation, and other inspection services.
The job included an arm’s length inspection of the entire bridge and underwater SONAR investigation. We provided the complete bridge inspection report to the Vicksburg Bridge Commission of Warren County in compliance with Federal Railroad Administration, which included recommendations for additional follow-up inspections, necessary repairs, and a capacity load rating based on the in-depth inspection. The load rating modeling was performed for normal and maximum operating conditions to ensure continued safe usage of the bridge.
The good news? Our inspection and analysis indicated that the bridge will likely remain safe for long-term use.
At a Glance
-
820
Foot Suspended Truss Span
-
1.6
Miles Long
- Location
- Vicksburg, Mississippi
- Offices
-
- Location
- Vicksburg, Mississippi
- Offices
Share
Gene Davis, Principal, Rail
Safely is the ONLY way. On a railroad, you have to live it, breathe it, and believe it.
Tommy Dudeck, Senior Associate, Transportation
Never let the past define the present and never sacrifice excellence in your work. Today’s successes are born from yesterday’s failures.
Brandon Elliot, Bridge Engineer
I’m a part of the important and regular bridge inspection process—this is not only a federal requirement, but also promotes public safety.
Seth Poole, Senior Bridge Engineer
The best projects are those that have been collaboratively developed so that design and construction innovations benefit everyone involved.
We’re better together
-
Become a client
Partner with us today to change how tomorrow looks. You’re exactly what’s needed to help us make it happen in your community.
-
Design your career
Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.