A project that flourished within time and seasonal constraints
We provided materials testing and inspection services during the construction of the concrete caissons. These were built to replace the deteriorating 1970s sheet pile marine structure at Deception Bay, which services Xstrata’s Raglan Mine.
Sensitive to the client’s need to maintain shipping schedules, reduce on-site construction, and operate within a four-month ice-free construction window, three concrete caissons were constructed in Nova Scotia and shipped over 2000 kilometres to the site.
The caissons (17 metres wide by 30 metres long by 21.5 metres high) were slip formed in Mulgrave harbour and required over 1,700 cubic metres of 58 MPa-strength advanced mix design concrete. We provided around-the-clock quality control and testing services during placement of the concrete to ensure the structures conformed with project specifications. Facing tight project constraints, the construction of the caissons was able to meet the quality, schedule and budget objectives.
At a Glance
- Offices
We’re better together
-
Become a client
Partner with us today to change how tomorrow looks. You’re exactly what’s needed to help us make it happen in your community.
-
Design your career
Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.