Extending a runway's life-cycle while minimizing construction impact on airport operations
Our initial analysis for the rehabilitation of Runway 4L-22R found that the overall pavement condition was inconsistent along the entire 7,800-foot length, with some areas experiencing more deterioration than others and other areas experiencing severe rutting caused by heavy aircraft operations. Our challenge was to come up with a rehabilitation plan to extend the life of the runway, but also to minimize construction impact on airport operations.
Working collaboratively with Massport, our team developed and tested several rut and fuel resistant bituminous pavement mixtures. The preferred warm mix alternative mitigated the rutting resulting from the high volume of heavy aircraft queuing for takeoff. This solution also prevented cracking from extreme winter and summer temperatures and continued Massport’s initiative to continue utilizing “green” pavement. To minimize operational delays and meet the project's urgent time frame, we developed a fast track, section-by-section and day-by-day method for managing the excavation and construction with team members in the field who were prepared to address all problems and issues as soon as they were uncovered.
We’re better together
-
Become a client
Partner with us today to change how tomorrow looks. You’re exactly what’s needed to help us make it happen in your community.
-
Design your career
Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.