Maximizing output while minimizing impact: How we brought a plant from coal to natural gas and almost tripled its output

At a Glance

  • 27K

    Homes Powered

  • 125MW

    From Natural Gas

Location
Hunlock Creek, Pennsylvania
Offices

Hunlock Power Station Repowering

Maximizing assets, getting more from less, and keeping up with market demand for cleaner energy generation. Those were the key issues the Hunlock Power Station Repowering project needed addressed and they chose Stantec to help deliver the project.

Originally a 44 megawatt coal fired power plant, the Hunlock Power Station’s output and method of generation were no longer sufficient. Stantec was selected to repower the facility, taking it from a coal burning facility, to a clean burning natural gas combined cycle plant, with 125 megawatts of capacity. In equivalent terms, the Hunlock facility went from producing power for 9,750 homes with coal, to providing power for 27,075 homes with clean burning natural gas.

Our work helped increase the amount of energy available to the community, while eliminating the need for coal and greatly reducing emissions.

At a Glance

  • 27K

    Homes Powered

  • 125MW

    From Natural Gas

Location
Hunlock Creek, Pennsylvania
Offices

We’re better together

  • Become a client

    Partner with us today to change how tomorrow looks. You’re exactly what’s needed to help us make it happen in your community.

  • Design your career

    Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.

End of main content
To top