Copper Concentrator Plant Semi-Autogenous Grinding Mill Upgrade

Providing engineering services for new copper ore grinding mills

  • $30M

    in Construction

  • New South Wales, Australia

    New South Wales, Australia

Designing new mills to increase efficiencies in mining operations

Located in New South Wales, a copper mine required a significant upgrade of its copper concentrator plant by replacing two semi-autogenous grinding (SAG) mills. The original SAG mills were installed in the late 1960s and have operated reliably for over 55 years, clocking up an estimated 270 million revolutions. However, cracking in the outer shell determined that repairing them was not an economical option, prompting the need for an upgrade.

Our team provided the engineering design and commissioning support to upgrade the new mills. Replacing the mills posed some challenges including working within tight timeframes to minimise production downtime. To overcome this, we provided flexibility with the timing of commissioning services to support the mill’s outages and detailed scanning and 3D modelling of the mills to increase design process efficiencies.

The new mill designs take advantage of modern technology and introduce variable speed drives as well as safety and maintenance improvements.

At a Glance

Offices
Expert Spotlight

Scott Haydon, Lead Designer

I enjoy converting engineering into drawings that convey design intent to the end user—providing a valuable contribution to any project.

Scott Haydon

Lead Designer

We’re better together

  • Become a client

    Partner with us today to change how tomorrow looks. You’re exactly what’s needed to help us make it happen in your community.

  • Design your career

    Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.

End of main content
To top